Cobtree Manor
TITLE
Client
Maidstone Borough Council
Key Points
-
Design and Build Project
-
Busy location
-
Sustainable solution through Value Engineering
-
Phased works
Contract Value
£283,000
Synopsis
This recently completed design and build project is to provide a durable and sustainable car park to serve this busy country park and represents a further expansion of the Steadline available services. The design brief was to provide a solution which maximised the site to provide increased parking and a finish that was sympathetic to the surrounding environment. Associated drainage is also installed and the existing construction was recycled and enhanced where possible.
The project has been constructed over a 9 week period in phases to leave at least 50 % of the car park in use at any time so the park remains accessible. Care had to be taken with the design to avoid damage to any of the mature trees.