Cobtree Manor

TITLE

Client

Maidstone Borough Council

 

Key Points

  • Design and Build Project

  • Busy location

  • Sustainable solution through Value Engineering

  • Phased works

Contract Value

£283,000

 

Synopsis

 

This recently completed design and build project is to provide a durable and sustainable car park to serve this busy country park and represents a further expansion of the Steadline available services. The design brief was to provide a solution which maximised the site to provide increased parking and a finish that was sympathetic to the surrounding environment. Associated drainage is also installed and the existing construction was recycled and enhanced where possible.

The project has been constructed over a 9 week period in phases to leave at least 50 % of the car park in use at any time so the park remains accessible. Care had to be taken with the design to avoid damage to any of the mature trees.

Cob Tree Manor
Cob Tree Manor

003
003

IMG_5607
IMG_5607

Cob Tree Manor
Cob Tree Manor

1/7