Projects

Civils,Construction & Rail

Bishop.png

Bishopstone

Steadline installed a new 25m long timber footbridge and walkway, spanning the Bishopstone stream in order to connect the cliff side steps to the concrete seafront causeway. As part of the scheme a full refurbishment of the existing steel steps was carried out as well as minor alterations to the reinforced concrete causeway.

 

Golden Green Culvert.png

Golden Green Culvert

A 20m span scaffold pedestrian footbridge was erected to maintain foot traffic across the watercourse, safely removing the risk of any site traffic from members of the public.​

Photo 01-10-2018, 17 22 32.jpg

Vinters Crematorium – Maidstone

Construction of additional parking bays at a busy crematorium together with resurfacing and construction of distributor road with associated drainage. Final planting and landscaping were also part of this project.

Vinters Crematorium – Maidstone​ 

Whistable.png

Whitstable Quay Wave Cut Off Wall

Steadline were contracted to construct the protection works to the West quay in Whitstable harbour and  wave impact wall to the quay.

Riverside Walk, Tonbridge
Hard Landscaping

A new pedestrian enhancement scheme to an area from the high street to Tonbridge Castle.

Wellington Crescent, Ramsgate

The existing panelled wall construction was becoming damaged from excess moisture and pressure building up from the cliff face immediately behind it