Carriageway resurfacing Folkestone
Repair Winter Damaged Carriageways
Project Strategic CHALLENGES
Project SYN0PSIS
This project was in response to the damaged highways across Kent. Steadline undertook a project in the Ashford and Folkestone & Hythe Areas of East Kent to repair winter damaged carriageways over a 3 year period. Works were both programmed and responsive in nature and requiring traffic management design and installation from road closures and diversions to multi-phase traffic signals.
Surface repairs were undertaken utilising Steadline in-house resources which varied from whole carriageway surfacing to small patch repairs to high standards. Building on this success a further 2-year contract extendable to 4 years has recently been awarded.
More Projects From Steadline Ltd
![Peckham Rye Station London Renovation](https://www.steadline.co.uk/wp-content/uploads/2022/09/Peckham-Rye-Station-London-Renovation.webp)
Peckham Rye Station London Renovation
Steadline were employed to complete staircase work and provide direct access to the waiting room from ground level.​
![Ramsgate-Wall-Protection](https://www.steadline.co.uk/wp-content/uploads/2022/09/Ramsgate-Wall-Protection-768x432.jpg)
Wellington Crescent Ramsgate Weather Protection
As a result, our client was left with the wall fully restored and shielded from moisture on both sides ensuring its stability and long term integrity.
![Teston Bridge, Nr Maidstone, Kent](https://www.steadline.co.uk/wp-content/uploads/2022/10/Teston-Bridge-Project-Steadline-Limited-Kent.png)
Teston Bridge Rebuild
Teston Bridge is a 15th Century Grade 1 listed structure over the river Medway. This project was to repair the bridge after a vehicle damaged it.