Vinters Crematorium Road Construction, Re-Surfacing and Landscaping
Road Construction, Road Re-Surfacing and Landscaping
Project Strategic CHALLENGES
Project SYN0PSIS
This recently completed project was to construct additional parking bays at a busy crematorium together with resurfacing and construction of distributor road with associated drainage. Final planting and landscaping were also part of this project
Due to the nature of the site noise and disruption is key to keep to a minimum. Daily liaison meetings were required in order to plan works around the schedule of this busy crematorium. Services were scheduled on a daily basis and this impacted on the type of works Steadline were able to undertake, noisy activities were planned outside of the core periods.
Regular communication with all stakeholders was key to the project success. Site deliveries again had to be scheduled together with removal of spoil around the crematorium schedule.
The works at the site have been increased by an extra 40 % which Steadline have been able to increase resource to accommodate most of this work within the existing contract period. During this period site delays occurred also through inclement weather as certain works had to cease in order to maintain clean and tidy site at all times
More Projects From Steadline Ltd
Peckham Rye Station London Renovation
Steadline were employed to complete staircase work and provide direct access to the waiting room from ground level.​
Wellington Crescent Ramsgate Weather Protection
As a result, our client was left with the wall fully restored and shielded from moisture on both sides ensuring its stability and long term integrity.
Teston Bridge Rebuild
Teston Bridge is a 15th Century Grade 1 listed structure over the river Medway. This project was to repair the bridge after a vehicle damaged it.